Manufacturing · Illustrative Blueprint
Multi-Facility ERP Data Sync & Operations Dashboard
Mid-sized manufacturer · 6 production facilities · legacy on-prem ERP
Event-driven sync6-week planERP integration
Illustrative blueprint: a representative scenario of a system we build, not a specific client engagement. Business details are generalised, and figures are design targets for this type of build, not reported client results.
The Challenge
Each facility exports production and inventory data from its own system into spreadsheets, and a central operations team spends 40+ hours a week reconciling them into the ERP. Numbers are a day old by the time managers see them, and mismatches between sites cause over-ordering and missed shipments.
Our Approach
- 01Map every data source per facility and define one canonical schema for production, inventory and shipment events.
- 02Stream changes from each facility through an event bus into a central PostgreSQL operations database, with validation and de-duplication at ingestion.
- 03Sync reconciled records into the ERP through its API, with an exceptions queue for anything that fails validation.
- 04Ship a real-time operations dashboard per facility and a consolidated view for leadership.
Tech Stack
- Node.js
- PostgreSQL
- Kafka / Redpanda
- ERP REST API
- Next.js dashboard
- Grafana alerting
Design Targets
- Manual reconciliation
- −30–40%
- Data freshness
- Minutes, not next day
- Uptime target
- 99.5%+
Delivery plan6-week build plan: 2 weeks discovery and schema, 3 weeks build, 1 week parallel run
Targets describe what this architecture is designed to achieve. Actual outcomes depend on your data, systems and scope.Have a similar problem?