HOME/CASE STUDIES/MERIDIAN MANUFACTURING
Manufacturing Case Study

Meridian Manufacturing: Operations Backbone Rebuild

−38% ops cost6-week delivery99.7% uptime

The Challenge

Legacy ERP system causing 40+ hours/week of manual data reconciliation across 6 production facilities.

The Solution

Replaced outdated sync logic with an event-driven database backbone and custom real-time facility monitoring dashboards.

"Lytnex rebuilt our entire operations backbone in 6 weeks. We eliminated 38% of our manual overhead on day one."

Sarah Chen, VP Operations
System Verification Logs
Verification statusPassed
System load capacity10,000+ sessions/s
Performance metrics resultDeploy time: Real-time | Overhead: −38% | Uptime: 99.7%
Operations Verification:This system architecture was built, load checked, and verified under production SLAs.
Ready to deploy your system?

Let's blueprint your custom setup.

Book a Strategy Call